Fields outside reliable coverage
A third-party RTK network may not cover remote fields or fit the operating requirements.
For agribusiness and farm groups
Connect your own base stations, deliver corrections to compatible equipment, and manage access separately for every farm, contractor, or machine.
Multi-farm architecture
Base · Northern cluster
RTCM
Base · Southern cluster
RTCM
YouCORS
Private NTRIP caster and access management
Farm 1 · 12 machines
Farm 2 · 9 machines
Farm 3 · 8 machines
Bases and machines have clear assignments by farm. One machine or contractor can be changed without interrupting the entire fleet.
Important: YouCORS delivers corrections from your base stations to your rovers, machinery, and applications. It does not sell access to a third-party RTK network or generate corrections without a source.
When the shared setup stops working
Permanent machines, seasonal equipment, and contractors may all work at the same time. Without separate access, every replacement creates risk for the entire fleet.
A third-party RTK network may not cover remote fields or fit the operating requirements.
Access for one farm cannot be changed safely without affecting the others.
A shared client does not identify which tractor or terminal is using the stream.
Shared credentials continue to work after planting or harvest work is complete.
Updating one shared password requires reconfiguring every connected machine.
Operators select the wrong mountpoint when bases and territories are named differently.
Returning equipment to service turns into collecting parameters and credentials again.
Agribusiness architecture
Separate correction streams and access by farm, production zone, and piece of equipment.
Your farm group's base stations send correction streams over the internet.
The private NTRIP caster receives sources and serves authorized clients.
Name streams by region, farm, or production zone.
Issue separate credentials to every compatible terminal.
Equipment sees only the correction streams required for its farm or task.
Manage access periods, credentials, and connection status centrally.
Before launch, confirm that each terminal or autosteer system supports the required NTRIP and RTCM versions. YouCORS does not claim compatibility with every equipment model.
Agricultural use cases
Organize NTRIP access around the structure of your business and the real fieldwork cycle.
Assign separate clients and correction streams to company-owned machinery.
Return machines to service through a saved and verified access model.
Issue temporary credentials for planting, application, or harvest operations.
Separate users and machinery by operating region and business unit.
Create distinct mountpoints for territories served by different sources.
Document an alternative stream before planned base maintenance.
Value for each role
Infrastructure remains centralized while each farm and operator works only with the parameters they need.
One managed model for bases, streams, machinery, and contingency procedures.
Centralized servers, ports, credentials, and connection status.
The business unit receives access only to its assigned bases and streams.
Consistent connection parameters without choosing unrelated sources.
Example configuration
Mountpoints are separated by territory, each machine receives a dedicated client, and contractor access is limited to the required period.
| Cluster | Farms | Bases | Machines | Prepared fallback |
|---|---|---|---|---|
| Northern | 2 | 3 | 18 | Backup base |
| Central | 2 | 2 | 11 | Backup internet |
| Southern | 1 | 1 | 6 | Alternative source |
This is an architecture example, not a coverage rule. The final setup depends on distance from bases, satellite observations, RTCM format, connectivity, and terminal compatibility.
Season readiness
Reliability depends on the base, connectivity, caster, terminal, and an agreed response procedure—not on one service alone.
YouCORS does not promise automatic failover or an SLA where the selected configuration does not provide them. Design and test every fallback procedure separately.
Test the correction path on real equipment before core operations begin.
Prepare an alternative connection where downtime is especially costly.
Document the stream and settings used during primary-base maintenance.
Replacing one client should not require changing the entire fleet.
Connect equipment in groups and validate every terminal configuration.
Define who checks the base, internet, caster, and terminal.
Pilot plan
A pilot in a real field validates compatibility and operating procedures before the whole fleet is migrated.
Step 1
Choose one farm with a clearly defined operating scenario.
Step 2
Connect one company-owned base station.
Step 3
Create a separate mountpoint with a clear name.
Step 4
Connect 1–2 pieces of RTK/NTRIP-compatible equipment.
Step 5
Validate operation in a real field and on typical routes.
Step 6
Document settings and the response to source unavailability.
Step 7
Scale the verified architecture to the remaining farms.
Frequently asked questions
Not unconditionally. A terminal must support compatible NTRIP and RTCM versions. Validate the exact model, firmware, and connection method in a pilot before scaling.
You need a configured source of RTCM corrections—typically your own base or another compatible source you are authorized to use. YouCORS does not generate or sell corrections.
Yes. Create separate mountpoints for bases and grant equipment access only to the required streams. Design the final architecture around territories and equipment characteristics.
Issue separate clients to machines and organize access through users, groups, and mountpoints that match your farm structure.
Yes. Create separate contractor credentials and disable them when the work is complete without changing the permanent fleet.
NTRIP correction delivery is interrupted. Receiver or autosteer behavior depends on its configuration, so test backup connectivity and operator procedures in advance.
Usage depends on RTCM message content and rate, the number of clients, and operating time. Measure traffic in a pilot with the actual base and terminal before choosing a connectivity plan.
Discuss your configuration
Share your current scale and equipment. Your email application will open a prepared message with the information needed to discuss a pilot.
Already validated the architecture?
Create an account and start a pilot with one base and a compatible terminal.
Continue to registration