For construction projects

RTK corrections for your site teams

Connect your base or relay an external NTRIP stream. Deliver corrections to survey crews, contractors, and compatible machinery, with access you control.

  • Separate access for each crew
  • Streams organized by project
  • Connection status in one dashboard

No credit card required. Relay included in the trial.

Site architecture

From your source to every crew

Access under control

Choose your correction source

Your base station

RTCM

or

External NTRIP stream via Relay

RTCM

YouCORS

NTRIP hosting and team access

Survey crews

Contractors

Compatible machinery

Assign each crew the streams it needs. Revoke a contractor’s access without changing everyone else’s credentials.

Relay is available in Trial and Enterprise. See how Relay works

Your correction source, your team access: YouCORS delivers RTCM streams from your base or an external NTRIP source you are authorized to use. You choose the source; we provide hosting and access management.

Complexity on a large site

Project participants change faster than shared access settings

Every stage introduces new contractors, work zones, and devices. Without one access model, it is difficult to revoke credentials safely or locate the source of a problem.

!

Contractors come and go

Access is needed only for specific work, but shared credentials remain with former participants.

!

One login cannot be revoked safely

Changing a shared password affects surveyors, contractors, and machinery at once.

!

Teams use different settings

Inconsistent stream names and connection settings make it harder to select the correct source for each work zone.

!

The work area keeps expanding

New zones and stages require a clear structure for mountpoints and clients.

!

The primary source is unavailable

Without a prepared procedure, teams do not know which stream and settings to use next.

!

The failure is not isolated

The correction source, internet, caster, and rover are investigated at the same time without a clear owner.

!

Responsibility is fragmented

The owner, general contractor, and subcontractors define RTK infrastructure boundaries differently.

Connect one crew, then scale

From a correction source to your field teams

Choose the source, organize streams by project, and give every crew its own access.

  1. 1

    Choose your correction source

    Use a configured site base or an external NTRIP stream suitable for the work area and permitted for your use.

  2. 2

    Connect the stream

    Publish RTCM from your base or use Pull Relay to receive an external stream. Relay is included in Trial and Enterprise.

  3. 3

    Separate mountpoints

    Use clear names organized by project, work zone, or construction stage.

  4. 4

    Give each crew its own access

    Create separate NTRIP client credentials for permanent staff and contractors.

  5. 5

    Limit access

    Assign streams by role and disable clients when the relevant stage is complete.

  6. 6

    Check connections and data

    Monitor source and rover sessions in the dashboard, then verify correction reception on the equipment.

YouCORS does not establish a common coordinate system by itself. Accuracy depends on correct base coordinates, survey control, RTCM format, and equipment configuration.

Project participants

Every organization receives only the access it needs

Separate permanent users, temporary contractors, and compatible machine-control systems while retaining centralized management.

Owner's survey team

Permanent access to core streams and responsibility for the survey control.

General contractor

Access for coordinating internal crews and assigned work areas.

Subcontractor crews

Separate clients limited to the duration and zone of specific work.

Machine-control systems

RTK/NTRIP-compatible terminals connected after their parameters are validated.

As-built survey team

Access to the assigned stream while completed work is measured and documented.

Technical inspection

Agreed access for independent verification and stage acceptance.

Access by project stage

The connection roster changes with the project

Define the roles, required stream, and access end point for every stage in advance.

  1. 01

    Site preparation

    Who connects
    Survey team, general contractor, and grading crews.
    When to revoke access
    Temporary crews after layout and preparation are complete.
  2. 02

    Earthworks

    Who connects
    Surveyors, earthwork contractors, and compatible machine control.
    When to revoke access
    Contractors when the earthwork package is closed.
  3. 03

    Utilities

    Who connects
    Installation crews, surveyors, and technical inspection.
    When to revoke access
    Installation contractors after the as-built survey for their zone.
  4. 04

    Roads and hardscape

    Who connects
    Road contractors, machinery, and the survey team.
    When to revoke access
    When work in the assigned zone is complete.
  5. 05

    Structural installation

    Who connects
    Erection crews, surveyors, and inspection staff.
    When to revoke access
    Subcontractors after the relevant stage is accepted.
  6. 06

    As-built survey

    Who connects
    The survey team and designated contractor specialists.
    When to revoke access
    After as-built documentation is delivered and verified.
  7. 07

    Handover and operations

    Who connects
    The operator and designated archive users.
    When to revoke access
    All project and contractor clients are reviewed and disabled.

Example configuration

2 correction streams, 8 rovers, 10 contractor clients

For example, use a base stream for one work zone and an authorized external stream through Relay for another. Assign crews the stream suitable for their work area.

correction streams
2
permanent rovers
8
temporary clients
10
StageRolesStreamAccess periodOwner
EarthworksSurveyors, machinerySITE-EARTHUntil stage closeLead surveyor
Utilities2 subcontractorsSITE-UTIL90 daysGeneral contractor
RoadworksCrew and machinerySITE-ROADWork scheduleProject engineer
As-built surveySurvey teamSITE-ASBUILTPermanentProject owner

This is an example access matrix, not a universal sizing rule. The final design depends on project scale, participants, work zones, equipment, and redundancy requirements.

Reliability and ownership

Diagnose the correction chain by control zone

YouCORS gives you one place to manage correction streams, access, and connections. Field results depend on the source, its coverage, and the receiving equipment.

A caster cannot correct wrong base coordinates, obstructed sky, radio interference, or incompatible RTCM. Assign an owner and diagnostic procedure to every link.

  1. Zone 1

    Correction source

    Base coordinates, observations, RTCM format, and coverage of the work area. For Relay, verify the upstream stream’s suitability.

  2. Zone 2

    Source connection

    The base’s internet connection or the upstream NTRIP service, credentials, and stream availability.

  3. Zone 3

    NTRIP caster and server

    Source reception, mountpoint, authorization, and delivery to clients.

  4. Zone 4

    Client parameters

    Host, port, mountpoint, credentials, and RTCM compatibility.

  5. Zone 5

    Field conditions

    Sky visibility, interference, satellite geometry, and rover or machine settings.

Site launch plan

Deploy the infrastructure before contractors mobilize at scale

Validate the technical chain and access rules with one crew, then connect the remaining participants stage by stage.

  1. 1

    Step 1

    Assign an owner for the site's RTK infrastructure.

  2. 2

    Step 2

    List your correction sources, work zones, and project participants.

  3. 3

    Step 3

    Create a trial caster and connect one base or external stream.

  4. 4

    Step 4

    Run a field test with one survey crew.

  5. 5

    Step 5

    Prepare one standard connection and diagnostic guide.

  6. 6

    Step 6

    Connect contractors through individual clients by stage.

  7. 7

    Step 7

    Design and validate a fallback procedure.

  8. 8

    Step 8

    Review active access and responsible owners regularly.

Frequently asked questions

Before launching RTK on a construction project

Do we need our own base station on the construction site?

No. You can publish corrections from your own base or use Pull Relay to receive an external NTRIP stream you are authorized to redistribute. Relay is included in Trial and Enterprise. The source must be suitable for your work area and equipment.

Can equipment from different manufacturers connect?

Yes, when equipment supports compatible NTRIP and RTCM versions. Validate every model, firmware version, and operating scenario before connecting at scale.

How do we provide access to a subcontractor?

Create a separate client, assign the required mountpoint, and disable the credentials when work is complete. Other participants do not need to be reconfigured.

Can one caster serve multiple construction projects?

Projects can be separated through mountpoints, clients, and groups. The choice between one or several casters depends on scale, ownership, regions, and isolation requirements.

How should we prepare a backup correction stream?

Define the backup source, mountpoint, client settings, and transition procedure, then test them on real equipment. Do not assume failover is automatic unless the configuration explicitly provides it.

Who is responsible for correct base coordinates?

The designated project survey team remains responsible. YouCORS transports the received stream and does not validate survey control or station coordinates.

What if the client is connected but RTK Fix is unavailable?

Check the correction source, RTCM format, internet, caster status, client permissions, and receiver conditions. With Relay, also check upstream coverage and stream suitability. A caster connection alone does not guarantee RTK Fix.

Does YouCORS supply RTK network coverage?

YouCORS provides NTRIP hosting and stream delivery. You provide a base stream or arrange access to an external source. Pull Relay receives one upstream stream and distributes the same stream to connected rovers; it does not generate per-rover VRS corrections.

Discuss your configuration

Choose the setup that fits your teams

Tell us about your correction sources, crews, and equipment. We can help you discuss the setup for your project.

Ready to connect your first crew?

Start a free 3-day trial with one base or an authorized external stream. No credit card required. Relay is included in the trial.

Start your free trial

Your request will be sent to our team to discuss the configuration.