Contractors come and go
Access is needed only for specific work, but shared credentials remain with former participants.
For construction projects
Deliver corrections from your own base to survey crews, contractors, and compatible machinery while keeping access manageable throughout every project stage.
Site architecture
Primary site base
RTCM
Backup base
RTCM
YouCORS
Private NTRIP caster and access management
Surveyors · 8 rovers
Contractors · 10 clients
RTK-compatible machinery
Core teams receive permanent clients while contractors receive separate access for the required stage. One organization can be removed without disrupting every other team.
Important: YouCORS delivers corrections from your base stations to rovers, machinery, and applications. It does not sell access to a third-party RTK network or generate corrections without a source.
Complexity on a large site
Every stage introduces new contractors, work zones, and devices. Without one access model, it is difficult to revoke credentials safely or locate the source of a problem.
Access is needed only for specific work, but shared credentials remain with former participants.
Changing a shared password affects surveyors, contractors, and machinery at once.
Inconsistent base and stream names increase the risk of selecting the wrong project zone.
New zones and stages require a clear structure for mountpoints and clients.
Without a prepared procedure, teams do not know which stream and settings to use next.
The base, internet, caster, and rover are investigated at the same time without a clear owner.
The owner, general contractor, and subcontractors define RTK infrastructure boundaries differently.
One site-wide architecture
Define the correction source, stream structure, and access procedure before participants connect at scale.
The responsible surveyor records coordinates, settings, and the purpose of each base station.
The site base sends its correction stream to the private NTRIP caster over the internet.
Use clear names organized by project, work zone, or construction stage.
Permanent staff and every contractor receive separate credentials.
Assign streams by role and disable clients when the relevant stage is complete.
Document connection, change, diagnostic, and access-revocation steps.
YouCORS does not establish a common coordinate system by itself. Accuracy depends on correct base coordinates, survey control, RTCM format, and equipment configuration.
Project participants
Separate permanent users, temporary contractors, and compatible machine-control systems while retaining centralized management.
Permanent access to core streams and responsibility for the survey control.
Access for coordinating internal crews and assigned work areas.
Separate clients limited to the duration and zone of specific work.
RTK/NTRIP-compatible terminals connected after their parameters are validated.
Access to the assigned stream while completed work is measured and documented.
Agreed access for independent verification and stage acceptance.
Access by project stage
Define the roles, required stream, and access end point for every stage in advance.
Example configuration
Core users receive permanent clients, contractors receive separate limited access, and mountpoints are named by zone and stage.
| Stage | Roles | Stream | Access period | Owner |
|---|---|---|---|---|
| Earthworks | Surveyors, machinery | SITE-EARTH | Until stage close | Lead surveyor |
| Utilities | 2 subcontractors | SITE-UTIL | 90 days | General contractor |
| Roadworks | Crew and machinery | SITE-ROAD | Work schedule | Project engineer |
| As-built survey | Survey team | SITE-ASBUILT | Permanent | Project owner |
This is an example access matrix, not a universal sizing rule. The final design depends on project scale, participants, work zones, equipment, and redundancy requirements.
Reliability and ownership
YouCORS simplifies correction transport and access management, but the result depends on every link from the base to the receiver's working conditions.
A caster cannot correct wrong base coordinates, obstructed sky, radio interference, or incompatible RTCM. Assign an owner and diagnostic procedure to every link.
Coordinates, antenna, satellite observations, and RTCM generation.
Connectivity, routing, and the ability to publish the stream externally.
Source reception, mountpoint, authorization, and delivery to clients.
Host, port, mountpoint, credentials, and RTCM compatibility.
Sky visibility, interference, satellite geometry, and rover or machine settings.
Site launch plan
Validate the technical chain and access rules with one crew, then connect the remaining participants stage by stage.
Step 1
Assign an owner for the site's RTK infrastructure.
Step 2
Document bases, work zones, stages, and every participant.
Step 3
Create a test caster and a clearly named mountpoint.
Step 4
Run a field test with one survey crew.
Step 5
Prepare one standard connection and diagnostic guide.
Step 6
Connect contractors through individual clients by stage.
Step 7
Design and validate a fallback procedure.
Step 8
Review active access and responsible owners regularly.
Launch resources
Understand the base, rover, corrections, and conditions required for RTK.
Read articleIndividual clients, groups, and temporary access for project teams.
Read articleValidate the source, server, and one test rover in a clear sequence.
Read articleIsolate problems across the base, transport layer, and receiver.
Read articleFrequently asked questions
You need a configured source of RTCM corrections—typically a site base or another compatible source you are authorized to use. YouCORS does not generate corrections itself.
Yes, when equipment supports compatible NTRIP and RTCM versions. Validate every model, firmware version, and operating scenario before connecting at scale.
Create a separate client, assign the required mountpoint, and disable the credentials when work is complete. Other participants do not need to be reconfigured.
Projects can be separated through mountpoints, clients, and groups. The choice between one or several casters depends on scale, ownership, regions, and isolation requirements.
Define the backup source, mountpoint, client settings, and transition procedure, then test them on real equipment. Do not assume failover is automatic unless the configuration explicitly provides it.
The designated project survey team remains responsible. YouCORS transports the received stream and does not validate survey control or station coordinates.
Check the chain in order: base observations, RTCM, internet, caster source status, client permissions, and rover conditions. A successful caster connection alone does not guarantee Fix.
Discuss your configuration
Describe the project scale and participants. Your email application will open a prepared message with the information needed to discuss a pilot.
Already validated the technical design?
Create an account and start a pilot with one base and one survey crew.
Continue to registration